31st March 2019 – Sutton Hoo
The entrance to Sutton Hoo’s overflow car park was a bit lumpy and had the wrong kind of matting underneath the surface, so on this task we dug it up and replaced it with stronger, more rigid gridding.
Difficult to tell the difference in the photos between the “before” and “after”, but this area of approx 60sqm will now be much more resistant to the scores of vehicles that will drive in and out of the car park over the next ten or more years!
Well done everyone on doing a great job!
[supsystic-gallery id=67 position=center]